The fixed date to switch N610/N670/N870/Integrator to GRAPE is Monday June 16th
If you want to test, or use GRAPE already before the Migration date, we have the following options:
Manual set the GRAPE provisioning URL:
Set the redirect to GRAPE on the current redirect and stop using the current redirect