If all measurement results of the field strength are recorded between the base stations, the synchronization plan can be defined.

In our example we need 4 levels.

  • Level 1: Base E
  • Level 2: The base stations A, B, D and F can be synchronized at the master station E
  • Level 3: The base station C is only a sufficient connection to the base station D. The base station G is only a sufficient connection to the base station F.
  • Level 4: The base station H is only a sufficient connection to the base station G.