You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Introduction

Then create an overview of the environmental conditions. What is the terrain like?

  • Total area Building plan
  • Number of floors
  • Outdoor coverage

How is the building fabric?

  • Materials
  • Type of windows e.g. mirrored glass
  • Planned construction measures  

Which disturbing influences are recognizable?

  • Reinforced concrete
  • Lifts
  • Fire doors
  • Supply lines

  • No labels