You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Introduction
  • The base stations should be installed at least 1.8 meters above the ground.
  • To the ceiling a minimum distance of 50 centimeters should be kept.
  • The optimal installation height for a base is between 1.8 and 3m depending on the room height.
  • The distance to supply lines, cable ducts or metal cabinets should also be at least 50 centimeters.
  • The approved operating temperature of the base stations is between + 5 ° and + 45 ° Celsius.
  • We recommend installing all base stations at the same height.
  • Do not install the base stations in Suspended ceilings, cup boards or other closed furnishings. The wireless coverage can be significantly reduced, depending on the materials used.
  • The base stations should be installed vertically.
  • The location and alignment of the base stations installed should be identical to the position deemed optimum during the measurement stage.
  • Avoid installations in the direct vicinity of cable channels, metal cupboards or other larger metal parts. These can reduce the radiation and couple into interfering signals. There should be a minimum distance of 50 cm.
  • Observer the safety distances and safety regulations.Observe the regulations specified in rooms where there is danger of explosions.

To supply a hotspot, several base stations can be mounted side by side.

  • The minimum distance between stations depends on the environment. If there is direct visual contact, a distance of 5 to 10 m should be maintained. If walls or furniture affect the signal, a distance of 1 to 2m may be sufficient.


FAQ N870 - Base stations mounting instructions




  • No labels