You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

Introduction

Here we describe how the Sennheiser DW Office is connected to the Maxwell 3.

Connecting Base Station to the Maxwell

  • Use a normal 8 pin Ethernet cable (17)
  • Connect to the Sennheiser Base station Phone socket.(8)
  • Connect to the Maxwell 3 EHS socket (6).




Sennheiser DIP switch settings

  • Set the DIP switch 1 and 4 to the lower position.


Adjusting the audio signal

  • Set the ABC switch (6) to A (Default), B or C so that you can hear a clear signal.


Adjusting the Microphone sensitivity

  • To change the volume, adjust the microphone volume control accordingly


  • No labels